My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014047
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BETHANY
>
0
>
2600 - Land Use Program
>
LAFC 24-20
>
SU0014047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 1:53:35 PM
Creation date
6/7/2021 1:50:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014047
PE
2688
FACILITY_NAME
LAFC 24-20
STREET_NUMBER
0
Direction
W
STREET_NAME
BETHANY
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95304-
APN
20916009
ENTERED_DATE
4/2/2021 12:00:00 AM
SITE_LOCATION
0 W BETHANY RD
RECEIVED_DATE
4/1/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Less Than Potentially Less Than Analyzed <br />g <br />Si nificant Significant with Mitigation Significant No In The <br />Impact Incorporated Impact Impact Prior EIR <br />XI. LAND USE AND PLANNING. <br />Would the project: <br />Physically divide an established community? <br />Cause a significant environmental impact due <br />to a conflict with any land use plan, policy, or <br />regulation adopted for the purpose of avoiding <br />or mitigating an environmental effect? <br />Conflict with any applicable habitat <br />conservation plan or natural community <br />conservation plan? <br />Result in Land use/operational conflicts <br />between existing and proposed on-site or off- <br />site land uses? <br />Impact Discussion: <br />a-d) This project is a Master Plan, Specific Plan I Amendment, and Site Approval application to convert an <br />existing Farm Service Headquarters facility to a Construction Services-Heavy operation. The Site <br />Approval application proposes the utilization of an existing 5,800 square foot building, and includes <br />the construction of a new 12,000 square foot office and warehouse building. <br />Master Plan Amendment and Specific Plan I Amendments <br />Mountain House Master Plan, Chapter 3 has a specific policy regarding the siting of uses for General Industrial <br />parcels in the Mountain House community. <br />Master Plan Section 3.7 INDUSTRIAL AND OFFICE USE POLICY o) states the following <br />Existing Language: <br />o) General Industrial areas shall be provided for building contractors, yard storage, building material <br />suppliers and similar businesses with very low density employment. General Industrial areas shall be <br />separated from residential or other sensitive land uses by non-sensitive land uses or other appropriate <br />buffers. <br />To strengthen the existing Master Plan policy language and provide for additional economic development <br />opportunities in the General Industrial areas the project applicant is requesting to amend the existing language <br />contained in Master Plan Section 3.7 Industrial and Office Use Policy (o). <br />New Language: <br />o) General Industrial areas shall be provided for t94.1414449-6oh#asters,yard storagel-building-material <br />&uppl-iers-arid---sicia-ila--13,14sine,ccc, with veey-low-Gtensity-empleymeRt. general and special trade <br />contractors engaged in heavy construction other than buildings. Outdoor yard storage areas of <br />equipment and materials is permitted and shall be screened with fences and walls as provided for in <br />the Mountain House Commercial, Office, and Industrial Design manual. Special control measures are <br />required for uses within the General Industrial areas and shall be separated from residential or other <br />sensitive land uses by non-sensitive land uses or other appropriate buffers. <br />Based on the proposed underlying project involving general and specialized trade contractors who engage in <br />a variety of construction projects i.e. highways, tunnels, street construction, water, sewer, and pipeline <br />construction. This update will ensure consistency with the proposed project and existing approved Mountain <br />House documents, future planned land uses, and existing community approvals. This minor text change to the <br />PA-2000063(MP), PA-2000064(SP), & PA-2000065(SA) - Initial Study 19
The URL can be used to link to this page
Your browser does not support the video tag.