Laserfiche WebLink
Master Plan General Industrial policy will also support the emerging demands in the heavy construction trade <br />and will modernize the existing language which in turn helps to create strong, vibrant, and economically viable <br />General Industrial projects for the Mountain House community. <br />No other text changes to the Master Plan document are proposed with this application request. <br />Specific Plan I Amendment <br />The Specific Plan Amendment would revise Figure 4.1 (Specific Plan I Expansion and Focus Areas) and Figure <br />4.13 (Old River Industrial Park Illustrative Concept Plan). These changes to the figures will ensure compatibility <br />with the proposed underlying project and consistency with the existing Master Plan land use designation of <br />General Industrial. <br />The construction and operation of the proposed project will not physically divide an established community. <br />The project is an orderly extension of the development that is established within the Specific Plan I Old River <br />Expansion and Focus Area for the Mountain House community. This area is planned for Industrial development <br />consistent with the Master Plan and Specific Plan I documents and existing community approvals. <br />Site Appovai <br />The project will not conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction <br />over the project adopted for the purpose of avoiding or mitigating an environmental effect, because the project <br />is consistent with all applicable Master Plan, Specific Plan I, land use policies and regulations of the County <br />Development Code and General Plan. Therefore, the project's impact on land use would be less than <br />significant. <br />The proposed project will not result in conflicts between existing and proposed on-site or off-site land uses <br />because the underlying project to-convert an existing Farm Service Headquarters facility, to a Construction <br />Services- Heavy Operation is consistent .with all land use policies and regulations of the 2035 General Plan <br />and Master Plan. The project parcel will be rezoned from AU-20 (Urban Agriculture, 20-acre minimum) to liG <br />(General Industrial). The Construction Services — Heavy use type may be conditionally permitted in the I-G <br />(General Industrial) zone with an approved Site Approval application. <br />PA-2000063(MP), PA-2000064(SP), & PA-2000065(SA) — Initial Study 20