Laserfiche WebLink
:A <br />Based on the cost estimates furnished in Item Number 2 above, the <br />following calculations indicate the estimated amount which will be <br />added to the Fund during the first year of operation of the site. <br />1991 In Place Volume 276,305 cy <br />1991 Gate Volume Measured in Tons 131,619 tons <br />Total Landfill Volume 17,300,000 cy <br />Closure Cost Estimate $2,531,842 X 1.2 = $3,038,210 "-° <br />Postclosure Cost $925,860 X 1.2 = $1,111,032 - <br />CLOSURE COST = 276,305/17,300,000 x $3,038,210 = $48,525 <br />POSTCLOSURE COST = 276,305/17,300,000 X $1,111,032 = 17.744 <br />TOTAL ADDED TO THE FUND, ANNUALLY $66,269 <br />FIRST YEAR CLOSURE COST PER TON = 48,525/131,619 = $0.37 ton <br />FIRST YEAR POSTCLOSURE COST = 17,744/131,619 = .14 ton <br />TOTAL COST PER TON $0.51 ton <br />Based on the above calculations, $0.51 per ton of waste arriving <br />at the proposed site will be collected with the gate fees and <br />reserved for payments to the Fund. On an annual basis, the actual <br />amount will be appropriately calculated and transferred to the <br />Solid Waste Closure Enterprise Fund. <br />If you have any questions you may reach me at (209)468-3066. <br />Sincerely, <br />Tom Horton <br />Solid Waste Manager <br />TH:th <br />Attachments <br />File Number LA 63102 <br />NCL PER.MV <br />