My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1987-1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1987-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:55:27 PM
Creation date
6/10/2021 2:46:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1987-1991
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br />18. Final Cover Soil <br />a. Thickness <br />1) Top deck (minimum 3 feet of soil & 1 foot of clay) <br />Td = (> 3' ) Use 3.5 ft (Clay excluded„) <br />2) Side slope (minimum 4 feet normal to -slope) <br />Ts = (> 41) Use 3.5 ft (Clay excluded) <br />b. Volume = [(Td x Ad) ► (TS x.As x C)/27 = (yd3) <br />1,244,444 <br />c. % Native soil 100 <br />d. Native material acquisition cost (excavation, hauling, <br />etc.) ( $/yd3 ) $. 1.05 _------ <br />e. Native soil cost $_1,306,667 _ <br />(Line 18b x Line 18c x Line 18d) <br />f . $ Imported soil <br />g. Imported material acquisition cost (purchase, delivery, <br />etc.) ($/yd3) _ 0 <br />h. Imported soil cost $ 0 _ <br />(Line 18b x Line 18g x Line 18h) <br />i. Placement, grading and compaction (to achieve relative <br />compaction of .90) unit cost ($/yd3) 0 <br />j. Placement, grading and compaction cost $ 0 <br />(Line 18b x Line 18j) <br />k. Subtotal final cover soil $ 1,306,667 <br />(Line 18f + Line 18i + Line 18k) <br />19. Clay Layer <br />a. Area to be capped (ft2) 9,221,216 <br />(Line 17a) <br />b. Thickness (ft) (minimum l foot) 1 <br />C. Volume ( yd3 ) 341,527 <br />(Line 19a x Tine 19b)727 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.