Laserfiche WebLink
20. <br />d. % On-site Clay 100 <br />e. On-site material acquisition cost (excavation, hauling, <br />etc. ) ($/yd3) 1.05 <br />E. On-site clay cost $ 358; 603 <br />(Line 19c x Line 19d x Line .19e) <br />g. Imported clay 0 <br />h. Imported material acquisition cost (purchase, delivery, <br />etc.) ($/yd3) 0 <br />i. Imported clay cost $ 0 <br />(Line 19c x Line 19g x Line 19h) <br />j. Placement/spreading, grading, compaction (to achieve <br />permeability no greal.er than 1 x 10 cm/sec) unit <br />costs ($/yd ) <br />1.00 <br />k. Placement, grading and compaction cost <br />(Line 19c x Line 19j) <br />$ 341,527 <br />1. Subtotal clay costs '$ 700,130 <br />(Line 19f + Line 19i + Line 19k) <br />Synthetic Membrane (if applicable) <br />a. Type of membrane (e.g., HDPE, CPE, PVC) N.A. <br />Thickness (minimum 30 mils) N.A.' <br />b. Quantity (ft2) N.A. <br />'c. Purchase, delivery and installation unit cost ($/ft2) <br />d. Synthetic layer testing (percent -of total synthetic <br />membrane unit cost) <br />0 % <br />15 <br />