Laserfiche WebLink
Drainage <br />35. Is there a surface water runon and runoff control system <br />existing at the site? <br />YES NO X <br />If NO, <br />a. What will be the estimated cost of installation and <br />construction of the drainage conveyance system to <br />accommodate anticipated runoff (e.g., diversion <br />ditches, downdrains, energy dissipators) and protection <br />from runon (e.g., dikes, levees, protective berms) <br />b. Cost of design <br />C. Drainage subtotal <br />(Line 35a + Line 35b) <br />$ 0 <br />$ 0 <br />$ 0 <br />Security <br />36. Is there a security system established at the landfill <br />(e.g., fencing surrounding the permitted site boundary, <br />access gates, locks on the gates, informational signs)? <br />YES NO X <br />a. What is presently in place at the site? (mark <br />appropriate boxes) <br />Z:�X:/ Fencing <br />Gates Locks <br />Signs Other (describe) <br />b. What will be the estimated cost of installing a <br />security fence, access gates with locks, and/or <br />informational signs (e.g., either around site perimeter <br />or around enclosures) to protect equipment and the <br />public.and is compatible with postclosure use? <br />$ 0 <br />20 <br />