Laserfiche WebLink
c. What will be the estimated cost of dismantling and <br />removing security equipment, not necessary after <br />closure and incompatible with post -closure use? <br />d. Security system costs $ 36,000 <br />(Line 36b or Line 36c) <br />37. Itemize costs on additional worksheets for closure <br />procedures, specific to this solid waste disposal site, and <br />attach at the end of this worksheet. Make sure each page is <br />appropriately labeled with site name and SWIS number. <br />Other - Closure Costs $ 0 - <br />POSTCLOSURE MONITORING AND MAINTENANCE COSTS <br />Revegetation <br />38. <br />39. <br />Fertilizing <br />a. Area to be fertilized (acres) 211,69 <br />b. Type of fertilizer 16-20-0 <br />C. Fertilizer unit cost ($/acre/yr) $ 100 <br />d. Fertilizing cost ($/yr) $ 21,200 <br />(Line 38a x Line 38c) <br />Irrigation <br />a. Type of irrigation system N.A. <br />b. Quantity (gallon/day) <br />f.. <br />Unit cost ($/gallon/day) $ <br />How many irrigation days per week?' - <br />Annual irrigation costs ($/yr) $' o' <br />{(Line 39b x Line 39c) x Line 39d x 52 wk/yr <br />Annual maintenance costs ($/yr) $ 0 <br />21 <br />