Laserfiche WebLink
a. Volume/unit frequency (e.g., gals/day, gals/month) <br />• <br />b. Unit cost of treatment <br />C. Annual costs of off-site treatment.' <br />($/yr) $ o <br />d Other.,(explain) <br />45. Leachate sampling and testing <br />a.' Number of samples/round" 6 <br />b. Sampling costs/round $ 2,010 <br />C. Frequency of sampling per year 4X <br />d. Annual sampling costs ($/yr) $ 8,080 <br />(Line 45b x Line 45c) <br />e. Testing costs/sample $ (Included in 45d) <br />f. Annual . testing costs ($/yr) $ (Included in 45d) <br />(Line 45a x Line 45c x Line 45e) <br />g. Annual sampling/testing cost subtotal <br />(Line 45d + Line 45f) <br />($/yr) $ 8,080 <br />46. Leachate management costs ($/yr) $ 22,480 <br />(Line 42b + Line 43d + Line 44c + Line 45g) <br />Monitoring <br />47. Gas Monitoring Systems <br />a. Monitoring devices of principal gases (e.g., Gastech, <br />OVA, etc.) <br />Gas Tech Model Gx <br />b. Frequency of monitoring (e.g., daily, weekly, monthly) <br />3 Mo (Quarterly) <br />23 <br />