Laserfiche WebLink
c. On-site annual monitoring*,costs-for principal gases? <br />11000 <br />d.- Annual sampling costs for trace gases? <br />($/Yr) $ 0 <br />e. Annual testing costs for trace gases? <br />($/Yr )` $ 0 <br />f. Assumed replacement frequency, of probes, in years. <br />30 <br />g. Installation unit cost for probes $ 900 <br />h. Annual replacement costs $ 240 <br />(Line 30i x Line 47g)/Line 47f <br />i. Annual maintenance costs ($/yr) 0 <br />j. Gas monitoring subtotal ($/yr) 1,240 <br />(Line 47c + Line 47d + Line 47e + Line 47h + Line 47i) <br />48. Is the vadose (unsaturated) zone monitored at this landfill? <br />YES NO g <br />If YES, <br />a. What type of monitoring procedures and equipment are <br />utilized? (e.g., vacuum/pressure lysimeter) <br />b. How many monitoring devices are be utilized? <br />Ce Annual sampling costs ($/yr) <br />d. Annual testing costs ($/yr) <br />e. Assumed replacement frequency, of devices, in years. <br />f. Installation unit cost of devices $ 0 <br />24 <br />