My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1987-1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1987-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:55:27 PM
Creation date
6/10/2021 2:46:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1987-1991
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tree and Shrub Plantings (Riparian and Upland). The tree and shrub plantings are <br /> primarily for screening purposes;therefore,there are no-net-loss objectives. Native tree and <br /> shrub plantings will improve wildlife habitat and aesthebasedic values. Therefore,on maintenance of the rrformance <br /> screening <br /> criteria for the tree and shrub plantings shall beased <br /> function. <br /> Each tree and shrub shall be evaluated annually for general health. For the measure <br /> to be considered successful, at least 50 percent of the plantings should be considered healthy <br /> and capable of growing without irrigation within 5 years. The drip-irrigation system will be <br /> checked for malfunctions and necessary adjustments shall be recommended. After 2 years, <br /> the biological monitor shall make a recommendation as to whether the irrigation system <br /> should be removed. <br /> Hydrologic Monitoring <br /> Wetland hydrology shall be monitored when the grading for the vernal pools,wetland <br /> swales, and marshes have been completed and there has been sufficient precipitation to fill <br /> the existing wetlands onsite. Water depths shall be measured twice each wet season in all <br /> created, protected, and selected unprotected vernal pools, swales, and marshes after the <br /> wetland hydrology has been determined. The depth measurements shall be taken from <br /> those sites selected for vegetation monitoring as identified above. The approximate duration <br /> of ponding and soil saturation shall be recorded for the same sites. Water depths and <br /> undisturbed wetlands <br /> periods of saturation in the created wetlands shall be compared <br /> to determine if hydrology in the created wetlands is similar to that of the undisturbed <br /> wetlands. <br /> Monitoring Schedule <br /> The monitoring schedule is designed to assist the biological monitor in implementing <br /> the monitoring program. The schedule is divided into tasks that address specific goals of <br /> the program, including collecting baseline data to establish performance criteria, monitoring <br /> wetland creation and revegetation efforts, and preparing the annual monitoring report. A <br /> suggested time frame for accomplishing the monitoring tasks is shown in Table 10. <br /> Reporting Results <br /> The results of the monitoring program shall be summarized in annual reports for a <br /> period of 5 years. Each annual report shall describe and interpret the results of the <br /> previous year's monitoring;include representative photographs of each sample site; evaluate <br /> the success to date of mitigation measures relative to mitigation performance standards; <br /> 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.