My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1987-1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1987-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:55:27 PM
Creation date
6/10/2021 2:46:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1987-1991
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> TABLE <br /> YEAR <br /> IMPLEMENTATION TASKS• MONTH 4 r It 12 t 2 3 4 S 6 7 i 9 10 11 12 t 2 3 ` 5 6 7 E 9 <br /> TASK 1: PRECONSTRUCTION AND PREPARATION <br /> I.l: Prepare Grading Pim <br /> J <br /> 1.2: Coolants with Natm Pint Gro*cr for Mwd Mx" <br /> 11t <br /> 1.3: Wentify and F.=Pmftck d Aron <br /> 1.4: Proaonstrooban Field Moettiag it <br /> 1.3: Salvage Wcdmd Pim"for Um In M'it&A an Azm :► <br /> TASK 2: CONSTRUCTION AND GRADING <br /> 2.1: Monitor Ourisc Cambuctim AativW" <br /> 2.2: Realign Crack Chm d <br /> 23: Grdo Mkk4A6on Arca.L SUM A Enbvom Rced <br /> 2.4: Salvage a sun*TopwA 6acn Di tmbd Vernal Pods.Uplaais <br /> 23: Remove Etaces Toprol <br /> 2.6: Construct Saaon®g 5- <br /> 2.7: b wuU Erasion Canard Davk- <br /> SUBTASK2A. CONSTRUCTION OF VERNAL,POOLS AND SWALFS <br /> 2A.1: Caned and Stove Vernal Pod&Swale Seed r a::•:< r<cx•>:< <br /> 2A.2: Dcicrutins Depth to Dt>zgpm at Pod Ctacmn Saar <br /> 2A.3: Caorsaud Vernal Pods and Swd= <br /> 2A.4: Conatrud Vernal Pod Beamer Aeom EXWXLg Swale" <br /> 2A.S: Monitor Cicalcd Vcmd Pod A Swsk Hydrology <br /> 2A.6: tnooAab Vernal Pools t Swdw with Sad" <br /> 2A.7: Recommend and ImpLomod Ramow Aaiwor }.•;::# }y.. <br /> SUBTASK 28: CONSTRUCTION OF ENCERGENT MARSH.RIPARIAN <br /> 2B.1: Caoswid Marsh®d R.iperism M'Qigaticat Sib- <br /> 26.2: hatstl Era-Ica Cantrd D-c= <br /> 2B.3: Ptml Marsh and Ripwrian Vin <br /> 2B.4: hw,4 Drip••-Irrigation Sys--- <br /> SUBTASK 2C: RE VEGETATION OF UPLANDS A SCREENING BntIt4S <br /> 2C.1: b a"n E a im Cmbd Devims <br /> 2C.2: Spr d Salvaged Upland Top mAl an Diaouixxi Atom <br /> 2C.3: Rescad Upton and Seaming Berms <br /> 2C.4: Picot Woody Vesoudwo mod bLaugrwmos <br /> 2C.S: Install Drip-Irr4A6=System <br /> TASK 3: SPECIAL-STATUS SPECIES <br /> 3.t: Perform Surveys for Burrowing Owis t t <br /> 32: Perform Survey%for California Trgcr Salamander <br /> 3.3: Mark and Feasm Owl Burrows <br /> 3.4: Coandt with Dcpu mrnl of Fwh&Game <br /> { 3.5: Prepare Species Managemol P1m(s)&SrbduWs) <br /> TASK 4: MAINTENANCE <br /> 4.1: Monitor Grssiog <br /> 42: Ranove liner From Mlingatian Ates <br /> 4.3: Rcmo s Drip-Irrigation Systema <br /> 4.4: Maintain Projod Aron Farnham <br /> TASKS: MONITORING PROGRAM <br /> S.i: Impinnml Bamcl w Monitoring Program <br /> 3.2: Imptamcd Cwatruaion Monitoring Program <br /> 3.3: Impkmmt Postwubucti n Monitoring Program <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.