My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1987-1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1987-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:55:27 PM
Creation date
6/10/2021 2:46:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1987-1991
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MITIGATION MEASURES <br />2. Department of Public Works• <br />a. An Improvement Plan, prepared <br />by a Registered Civil Engineer , <br />showing drainage, driveway access <br />details, on-site parking, and <br />grading shall be submitted to the <br />Department of Public Works, <br />Public Services Division, for <br />approval. <br />RESPONSIBLE AGENCY/PARTY <br />San Joaquin County Public Works <br />Solid Waste Division <br />Solid Waste Manager <br />b. The frontage improvements for San Joaquin County Public Works <br />Harney Lane shall be constructed Deputy Director, Engineering Services <br />to provide a through lane and a <br />right -turn (stacking) lane south <br />of the center line of Harney <br />lane. <br />C. A roadway dedication wide Same as 2. b. <br />enough to allow for the frontage <br />Improvements is required on <br />Harney Lane. <br />MONITORING <br />Improvement Plan approval shall be <br />received from the Public Services <br />Division prior to construction. <br />During Harney Lane widening project <br />construction project. <br />Same as 2. b. <br />d. A groundwater monitoring San Joaquin County Public Works The County Solid Waste Division <br />program shall be prepared which Solid Waste Division reports quarterly to the RWQCB. <br />is acceptable to the Central Solid Waste Manager <br />Valley regional Water Quality The California Regional Water Quality <br />Control Board. The program shall Control Board has issued Waste <br />be implemented prior to initial Discharge and monitoring requirements <br />on-site landfill operations. for the landfill. <br />e. The project shall be designed Same as 2. a. <br />and engineered so that proper Same as 2. a. <br />channelization/detention of <br />stormwater sheet flow is not <br />diverted onto adjoining <br />properties or does not cause <br />increased flows in water courses <br />and cause flooding. <br />n <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.