Laserfiche WebLink
MITIGATION MEASURES <br />2. Department of Public Works• <br />a. An Improvement Plan, prepared <br />by a Registered Civil Engineer , <br />showing drainage, driveway access <br />details, on-site parking, and <br />grading shall be submitted to the <br />Department of Public Works, <br />Public Services Division, for <br />approval. <br />RESPONSIBLE AGENCY/PARTY <br />San Joaquin County Public Works <br />Solid Waste Division <br />Solid Waste Manager <br />b. The frontage improvements for San Joaquin County Public Works <br />Harney Lane shall be constructed Deputy Director, Engineering Services <br />to provide a through lane and a <br />right -turn (stacking) lane south <br />of the center line of Harney <br />lane. <br />C. A roadway dedication wide Same as 2. b. <br />enough to allow for the frontage <br />Improvements is required on <br />Harney Lane. <br />MONITORING <br />Improvement Plan approval shall be <br />received from the Public Services <br />Division prior to construction. <br />During Harney Lane widening project <br />construction project. <br />Same as 2. b. <br />d. A groundwater monitoring San Joaquin County Public Works The County Solid Waste Division <br />program shall be prepared which Solid Waste Division reports quarterly to the RWQCB. <br />is acceptable to the Central Solid Waste Manager <br />Valley regional Water Quality The California Regional Water Quality <br />Control Board. The program shall Control Board has issued Waste <br />be implemented prior to initial Discharge and monitoring requirements <br />on-site landfill operations. for the landfill. <br />e. The project shall be designed Same as 2. a. <br />and engineered so that proper Same as 2. a. <br />channelization/detention of <br />stormwater sheet flow is not <br />diverted onto adjoining <br />properties or does not cause <br />increased flows in water courses <br />and cause flooding. <br />n <br />11 <br />