Laserfiche WebLink
4 . It has been verified by County staff that the County <br /> Storm Drain Design Manual standards referred to in the <br /> project RDSI, page 41, meet the WDR requirements for the <br /> site drainage facilities. A Copy of the County Standards <br /> are enclosed in support of this determination. <br /> Additionally, the 100-year frequency curve is enclosed <br /> and is to be used instead of the 10 year curve. <br /> 5. The Quality Assurance / Quality Control Plan for sample <br /> analysis is included in the Plan report as Appendix B, <br /> SAMPLING AND ANALYSIS PROCEDURES. <br /> I hope these additional documents will allow you to complete the <br /> review. Please call me or Rudy Rodriguez at (209) 468-3066 if other <br /> documents are needed. <br /> Very truly yours, <br /> Tom Horton <br /> Solid Waste Manager <br /> TH:jr <br /> Enclosures <br /> c: Ed Padilla <br /> San Joaquin County <br /> Public Health Services <br /> Janet Page <br /> CIWMB <br />