My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0083704_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
2121
>
2600 - Land Use Program
>
SR0083704_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 1:46:58 PM
Creation date
6/10/2021 3:48:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0083704
PE
2602
STREET_NUMBER
2121
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
12908009
ENTERED_DATE
5/12/2021 12:00:00 AM
SITE_LOCATION
2121 N ZUCKERMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 May 2021 <br />Project No. 21-6390 <br />Page 2 of 14 <br />use type of the property is miscellaneous, and the current zoning is not listed. Each PG&E <br />station is provided water from groundwater wells located at the stations. (Appendix A; <br />Figure 3). A groundwater well is planned to be installed in the proposed project area to <br />provide water to the office and planned development. <br /> <br /> <br />1.2. DESCRIPTION OF PROPOSED DEVELOPMENT <br /> <br />The proposed development will include the construction of an approximately 7,500 square <br />foot commercial office building, one groundwater well, an 83,440-gallon water tank, and <br />one septic system (Figures 3, 5 and 6). The office building and associated structures will <br />be developed approximately 20 feet above ground surface on a berm built up using soil <br />from the surrounding parcel area (Figures 4 through 6). The total project area is <br />approximately 102,802 square feet with 59,384 square feet of landscaped area. The <br />remaining area around the office building will be surfaced and used for parking. The <br />proposed septic system will be located in the southeastern corner of the project area, <br />south of the proposed office building. The planned locations of the office building and <br />septic system are depicted in Figures 5 and 6. Due to the size of the subject property <br />parcel (565 acres), the 22-acre area surrounding the project location will be used as the <br />project study area. No additional development is proposed in the project study area. <br /> <br /> <br />1.3. PARCEL VICINITY LOCATION MAP <br /> <br />San Joaquin County Assessor’s Map Book 129 Page 8 depicts the site parcel (APN 129- <br />080-090) in the southeastern portion of the page. The parcel is bordered to the north <br />(129-080-050 and 129-080-630), west (129-310-070 and 129-310-110), south (129-310- <br />150), and east (129-080-570) by multiple agricultural and miscellaneous properties. The <br />parcel vicinity map and a satellite overview map are included in Appendix A. <br /> <br /> <br />1.4. SITE MAP <br /> <br />A plan of the specific site features (i.e., structures, drives, wells, septic systems, large <br />trees, pastures, etc.) is illustrated in Figures 2 through 6. <br /> <br /> <br />2.0. PRESENT AND PAST USAGE OF SITE <br /> <br />Portions of the subject property parcel are currently being used as PG&E gas storage <br />facilities and have been since 1974. Prior to PG&E development, the subject property <br />was likely used for agricultural purposes. One gas storage well is located within the <br />22-acre project study area. According to The Geologic Energy Management Division's <br />(CalGEM) online mapping application, McDonald Island Farms Gas Well No. 9 is located <br />approximately 200 feet south of the project location and is currently idle (Figure 3).
The URL can be used to link to this page
Your browser does not support the video tag.