Project Number 2098RV45 November 30 2017 <br /> 5. Performing soil and soil vapor laboratory analysis. Fast turn-a-round time (TAT) <br /> will be requested of the laboratory for chemical analyses of samples; <br /> 1/8/2018 - 1/11/2018 <br /> Phase Two <br /> Groundwater monitoring wells will only be installed if the First Phase of <br /> Investigation indicates that a release has occurred and groundwater resources <br /> are potentially impacted. However, in order to keep any potential delays <br /> between Phase One and Phase Two to a minimum, the San Joaquin County <br /> Environmental Health Department Well/Pump Permit Application has already <br /> been completed, and will be filed immediately upon determination that Phase <br /> Two is necessary. A copy of the completed permit is included as Appendix C. <br /> 6. Approximately 3 weeks will be necessary to obtain well drilling permit; <br /> 1/15/2018 - 2/5/2018 <br /> 7. Once the drilling subcontractor is scheduled, the site visit will be conducted to <br /> mark borings and locate utilities. Three (3) working days prior to drilling, USA <br /> Underground will be notified for utility locating; <br /> 2/5/20182/9/2018 <br /> 8. It is estimated that the drilling work to install groundwater monitoring wells <br /> will take approximately 2 days includes mobilization and; <br /> 2/12/2018 2/16/2018 <br /> 9. After well installation, it will require and additional week to develop the <br /> groundwater monitoring wells, sample groundwater at the wells and have the <br /> wells surveyed. <br /> 2/19/2018 - 2/23/2018 <br /> 10.Performing groundwater laboratory analysis. Fast turn-a-round time (TAT) will <br /> be requested of the laboratory for chemical analyses of samples; <br /> 2/26/2018 - 3/2/2018 <br /> 11.A SIROF will be issued approximately 14 days after receipt of the laboratory <br /> reports. <br /> If groundwater investigation is not necessary: l/15/2018 - 1/31/2018 <br /> If groundwater investigation is necessary: 3/5/2018-3/16/2018 <br /> Note: Due to the phased approach, an extension of time will be needed if <br /> groundwater investigation is warranted. This phased approach will help avoid <br /> placing wells in locations with high soil contamination, if groundwater <br /> investigation is necessary. <br /> E2C Remediation 9 <br />