Laserfiche WebLink
Type Il Work Plan - Addendum <br />UXO Construction Activities and Soil Removal Action <br />Preliminary Assessment/Site Investigation Update <br />California Army National Guard Facility <br />Stockton. California <br />Contract No. GS-00E-007L/Task Order W9I238-05-F-0084 <br />Version 2.0 <br />2.0 SAMPLING OBJECTIVE <br />The sampling objective is twofold: to characterize the buried waste and/or contaminated <br />soil for disposal; and to confirm the removal is complete. The removal will be deemed <br />complete when laboratory analysis of confirmation soil samples indicates that target <br />analytes exceeding applicable regulatory limits have been removed from the Site. <br />104700.4965.300 Page C FSP-3 April 2007