Laserfiche WebLink
Type II Work Plan - Addendum <br />UXO Construction Activities and Soil Removal Action <br />Preliminary Assessment/Site Investigation Update <br />California Army National Guard Facility <br />Stockton, California <br />Contract No. GS-00E-007IJTask Order W91238-05-F-0084 <br />Version 2.0 <br />5.0 FIELD AND SAMPLING DOCUMENTATION <br />Field documentation prepared during excavation activities will include Daily Quality <br />Control Reports and Progress Photographs. The Daily Quality Control Reports will <br />contain details of site conditions, personnel and equipment on site, and work performed. <br />Progress photographs will provide visual documentation of the information provided in <br />the Daily Quality Control Reports. <br />Waste Profile Sheets, manifests, and disposal certificates will be provided to CESPK and <br />CA ARNG upon completion of the project. <br />Following completion of laboratory analysis, Versar will validate the data and provide a <br />summary of the findings in a Data Review Report. The Data Review Report will include <br />review of all QC parameters such as holding times, reporting limits, method blanks, <br />surrogate recoveries, matrix spikes and duplicates, and laboratory control samples. <br />104700.4965.300 Page C F5P-6 April 2007