My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
8010
>
2900 - Site Mitigation Program
>
PR0542459
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 10:48:47 AM
Creation date
6/11/2021 10:12:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542459
PE
2965
FACILITY_ID
FA0024400
FACILITY_NAME
CAARNG STOCKTON FMS #24
STREET_NUMBER
8010
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
8010 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Boring Results and VEG/ISCO Work Plan <br />Field Maintenance Shop #24, Stockton, California October 2016 <br />final schedule will depend on the CVRWQCB approval of the work plan and VEG/ISCO contractor <br />availability. A tentative schedule for all site activities is summarized below. <br />Task Estimated Date <br />Work Plan Approval and Permitting September 2016 <br />Utility location prior to VEG Well Installations September 2016 <br />VEG Implementation September-October 2016 <br />ISCO Injections November 2016 - 1 week after VEG <br />implementation <br />30-day post-ISCO sampling event 30 days after ISCO injections <br />Post-ISCO Waste Pickup Event 1 Within 45 days of completion of field activities <br />30-day MRP Report to the RWQCB 60 days from 30-day MRP sampling event <br />90-day post-ISCO sampling event 90 days after ISCO injections <br />Post-ISCO Waste Pickup Event 2 Within 45 days of completion of field activities <br />90-day MRP Report to the RWQCB 60 days from 90-day MRP sampling event <br />180-day post-ISCO sampling event 180 days after ISCO injections <br />Post-ISCO Waste Pickup Event 2 Within 45 days of completion of field activities <br />180-day MRP Report to the RWQCB 60 days from 180-day MRP sampling event <br />Meeting with CVRWQCB regarding site <br />closure evaluation <br />After completion of sampling events and <br />reporting, prior to submittal of Annual Report <br />Annual Remedial Action Progress Report to <br />RWQCB <br />270 Days after ISCO injections <br />Page 12 •
The URL can be used to link to this page
Your browser does not support the video tag.