Laserfiche WebLink
Type II Work Plan - Addendum <br />UXO Construction Activities and Soil Removal Action <br />Preliminary Assessment/Site Investigation Update <br />California Army National Guard Facility <br />Stockton, California <br />Contract No. GS-00E-0071../Task Order W91238-05-F-0084 <br />Version 2.0 <br />10.0 QUALITY CONTROL PLAN <br />The purpose and scope of the Quality Control Plan (QCP) is to provide details of the approach, <br />methods, and operational procedures to be employed to perform quality control (QC) for the <br />UXO Construction Activities and Soil Removal Action project. This section is unchanged from <br />the WP. Reference Sections 10.1 — Audit Procedures, 10.2 — Corrective Action, and 10.3 — <br />Record Keeping in the WP. <br />104700.4965.300 Page 10-1 April 2007