Laserfiche WebLink
Type II Work Plan - Addendum <br />UXO Construction Activities and Soil Removal Action <br />Preliminary Assessment/Site Investigation Update <br />California Army National Guard Facility <br />Stockton, California <br />Contract No. GS-00F-007L/Task Order W91238-05-F-0084 <br />Version 2.0 <br />11.0 ENVIRONMENTAL PROTECTION PLAN <br />The Environmental Protection Plan describes the approach, methods, and operational procedures <br />to be employed to protect the natural environment during performance of UXO Construction <br />Activities and Soil Removal Actions at the CA ARNG Stockton facility. Each of the field work <br />locations is within the fenced and graded areas of the facility. No disturbance of natural <br />environmental areas is anticipated. This section is unchanged from the WP. Reference Sections <br />11.1 — Soil Management Plan, 11.2 — Dust Control Plan, 11.3 Spill Prevention Plan, and 11.4 — <br />Stormwater Management Plan in theWP. <br />104700.4965.300 <br /> Page 11-1 April 2007