Laserfiche WebLink
Type II Work Plan - Addendum <br />UXO Construction Activities and Soil Removal Action <br />Preliminary Assessment/Site Investigation Update <br />California Army National Guard Facility <br />Stockton, California <br />Contract No. GS-00E-007L/Task Order W91238-05-F-0084 <br />Version 2.0 <br />12.0 INVESTIGATIVE DERIVED WASTE PLAN <br />12.1 INVESTIGATIVE DERIVED WASTE PLAN <br />Investigative derived waste anticipated from UXO Construction Activities and Soil Removal <br />Actions comprises personal protective equipment (PPE), plastic sheeting, and decontamination <br />water. All PPE and plastic sheeting will be placed in trash bags and temporarily stored in <br />properly labeled 55-gallon drums. Decontamination water will be added to the excavated soils <br />for later disposal or stored in 55-gallon drums, as appropriate. <br />Following completion of removal activities, all investigative derived waste produced during the <br />debris/contaminated soil removal will be disposed of with the soil at an appropriate landfill. <br />104700.4965.300 Page 12-1 April 2007