Laserfiche WebLink
Work Plan for Installation of Temporary Soil Gas Sampling Probes, Page 4 <br />Soil Gas Sampling, and Laboratory Analyses <br />ELLIS SUBDIVISION <br />WKA No. 12002.03 <br />August 8, 2018 <br />All work will be performed under the supervision of a California Professional Geologist in <br />accordance with current state and local guidelines. Should you have questions about the above <br />scope of work, or if you need additional information, please do not hesitate to contact Kurt <br />Balasek or me at (916) 372-1434. <br />Sincerely, <br />Wallace-Kuhl & Associates <br />Matthew A. Taylor K rt Balasek, P.G., C.HG. <br />Project Manager Senior Hydrogeologist <br />Attachment: Figure 1 — Vicinity Map <br />Figure 2 — Parcel Map <br />Figure 3 — Soil Gas Sampling Probe Location Map <br />Figure 4 — Temporary Soil Gas Sampling Probe (Typical) <br />HADept. 3- G&E\Active Jobs\ 12002.03 - Ellis Subdivision\Work Plan for Temporary Soil Gas Sampling Probes, Soil Gas Sampling, <br />and Laboratory Analyses.doc