Laserfiche WebLink
Site Assessment & Well Install Work Plan Addendum — October 2016 <br />MCBILLIN REAL ESTATE INVESTMENT <br />2154 South El Dorado Street, Stockton, California <br />TABLE OF CONTENTS <br />SECTION PAGE <br />1.0. INTRODUCTION 1 <br />2.0. SCOPE OF WORK 1 <br />2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES 2 <br />2.2. DRILLING AND SAMPLE ANALYSIS 2 <br />2.3. MONITORING WELL INSTALLATION, DEVELOPMENT, AND SURVEY 4 <br />2.4. GROUNDWATER SAMPLING AND ANALYSIS 5 <br />2.5. PREPARATION OF REPORT OF FINDINGS 5 <br />3.0. FIELD PROCEDURES 5 <br />3.1. OFF-SITE BORING ADVANCEMENT AND SAMPLING 5 <br />3.2. WELL COMPLETION AND ELEVATION SURVEY 6 <br />3.3. WELL DEVELOPMENT 7 <br />3.4. GROUNDWATER SAMPLING PROCEDURES 7 <br />3.5. ON-SITE SOIL BORING ADVANCEMENT AND SAMPLING 7 <br />3.6. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT 8 <br />FIGURES <br />Figure 1 - Location Map <br />Figure 2 - Site Plan <br />Figure 3 - Proposed Offsite Groundwater Monitoring Well Locations <br />Figure 4 — Proposed Shallow Monitoring Well Design <br />Figure 5 — Proposed Deep Monitoring Well Design <br />TABLES <br />Table 1 - Summary of Monitoring Well Construction Details <br />Table 2 - Analytical Results of Soil Samples <br />Table 3 - Groundwater Elevations <br />Table 4 - Groundwater Analytical Results <br />Table 5 - Analytical Results of Grab Groundwater Samples <br />APPENDICES <br />Appendix A - Regulatory Directive Letters <br />Appendix B - Monitoring and Sampling Procedures <br />Advanced GeoEnvironmental Inc.