Laserfiche WebLink
Health and Safety Plan <br />705 Carlton Avenue, Stockton, CA <br />EFI Global Project No. 9836003958 <br />1.0 INTRODUCTION <br />EFI Global has prepared t his Health an d Safety PI an (HASP) for subsurface investigation and assess ment <br />activities to be conducted at the co mmercial property located at 705 Carlton Avenue in Stock ton, California <br />(the Site, Figure 1). This HASP enco mpasses soil and groun dwater sam piing of potentially contaminated <br />soils within the Site area utilizing drilling equipment. <br />Investigation activities include boring advancement into soil for subsurface assessment. This HASP outlines <br />the scope of work to be completed and hazards that may be encountered during field activities on-site. <br /> <br />2.0 SITE DESCRIPTION <br />The Site is located at the southwest corner of the intersection of Carlton Avenue and Park Street in Stockton, <br />California (Figure 1). T he Site is approxim ately 4.45 acres and is developed with a single-story <br />office/warhouse structure, which is ap proximately 62,000 square feet in size. The structure is currently <br />unoccupied and was most recently occupied as recently as two months ago by Asco Power Technolotgies / <br />Vertiv-Emerson Corporation, an electri cal equipment manufacturer. A two-stage clarifier is located on the <br />south exterio r portion of the on-site structure. Th e approxim ate capa city of the clarifie r and date of <br />installation are currently unknown. Floor drains located within the on-site structure drain directly to the <br />clarifier. Groundwater is estimated to be less than 10 feet below ground surface in the area of the Site and is <br />assumed to flow towards the west-southwest. <br />Figure 1 presents a Site Location Map, and Figure 2 presents a Site Plan. <br /> <br />3.0 SCOPE OF WORK <br />EFI Global's field scope of work will include the following: <br />The proposed work includes the drilling of 8 soil borings to target depth of 10 feet bgs utilizing a direct push <br />drill rig. Soil and groundwater samples will be collected at various depths. <br />This HASP covers the performance of the following activities: Drilling and soil and groundwater sampling. <br /> <br />4.0 EMERGENCY CONTACT INFORMATION <br />The following are emergency contacts designated for this project: <br />PARAMEDICS 911 <br />POLICE 911 <br />FIRE 911 <br />SPILL 911 <br />CALIFORNIA POISON CONTROL 1-800- 222-1222 <br />EFI Global Office (310) 854-6300 <br />Brian Martasin — Cellular Telephone (310) 237-2009 <br />Matthew Sonnenberg — Cellular Telephone (415) 316-5962 <br />Benjamin Curry — Cellular Telephone (310) 279-3631 <br />EFI Global <br />Engimenng. FIre & <br />Env ranmt-TrIal SC4V1(1, Page 1 of 19