Laserfiche WebLink
TABLE 3 <br />Soil Boring and Well Construction Details <br />Former Chevron Service Station No. 94054 <br />2103 Country Club Boulevard, Stockton, California <br />Well No. Date <br />Top of <br />Casing <br />Elevation <br />(feet-MSL) <br />Total <br />Depth <br />(feet bgs) <br />, <br />Screen <br />Interval <br />(feet bgs) <br />Fitter Pack <br />(feet bgs) <br />Bentonite <br />Seal <br />(feet bgs) <br />Notes <br />DVE-16 02/00 — Well was destroyed 4003 <br />SP-1 02/00 Well was destroyed 4003 <br />SP-2 02/00 Well was destroyed 4003 <br />SP-3 02/00 Well was destroyed 4003 <br />SP-4 02/00 — Well was destroyed 4003 <br />SP-5 02/00 — Well was destroyed 4003 <br />SP-6 02/00 Well was destroyed 4003 <br />SP-7 07/02/02 30 26.5 - 29 25 - 30 23 - 25 Well was destroyed 4003 <br />SP-8 07/02/02 30 26.5-29 26- 30 23- 25 Well was destroyed 4003 <br />SP-9 07/02/02 30 27.5 - 30 25 - 30 23 - 25 Well was destroyed 4003 <br />Vapor Probes <br />VP-1 05/89 14 <br />VP-2 05/89 14 <br />VP-3 05/89 14 <br />VP-4 05/89 14 <br />VP-5 05/89 14 <br />VP-6 05/89 14 . <br />VP-7 05/89 14 — <br />VP-8 05/89 — 14 <br />VP-9 05/89 14 <br />VP-10 05/89 14 <br />VP-11 05/89 14 <br />VP-12 05/89 14 <br />VP-13 05/89 14 <br />VP-14 05/89 14 <br />VP-15 05/89 14 <br />VP-16 05/89 14 <br />VP-17 05/89 14 <br />VP-18 05/89 14 <br />VP-19 05/89 14 <br />VP-20 05/89 14 <br />VP-21 05/89 14 <br />Soil Vapors <br />SV-1 05/03/07 7 5 6.79 - 7 6 - 7.5 5 - 6 Well was destroyed 4003 <br />SV-2 05/03/07 7.5 6.79- 7 6- 7.5 5 -6 Well was destroyed 4003 <br />SV-3 05/03/07 7.5 6.79 - 7 6- 7.5 5 - 6 Well was destroyed 4003 <br />SV-4 05/03/07 7 6.29 - 6 5 6 -7.5 5- 6 Well was destroyed 4003 <br />SV-5 05/03/07 7 5 6 79 - 7 6 - 7.5 5 - 6 Well was destroyed 4003 <br />SV-7 05/03/07 7.5 6.79 - 7 6 - 7 5 5 - 6 Well was destroyed 4003 <br />SV-8 05/03/07 7.5 679 - 7 6 - 7.5 5 -6 Well was destroyed 4003 <br />SV-9 05/03/07 7.5 6.79 - 7 6- 7.5 5 - 6 Well was destroyed 4Q03 <br />Piezometer <br />PZ-1 03/09/04 30 25- 30 Piezometer was destroyed April 20, 2004 <br />PZ-2 03/09/04 50 45- 50 Piezometer was destroyed April 20, 2004 <br />PZ-3 03/09/04 50 45- 50 — Piezometer was destroyed April 20, 2004 <br />PZ-4 03/09/04 50 45 - 50 Piezometer was destroyed April 20, 2004 <br />94054 Soil Boring and Well Construction Details.xlsx 2 of 4 <br /> Stantec