My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
2900 - Site Mitigation Program
>
PR0543854
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 4:58:27 PM
Creation date
6/11/2021 3:35:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543854
PE
2960
FACILITY_ID
FA0024935
FACILITY_NAME
FORMER CHEVRON 94054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
01
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3 <br />Soil Boring and Well Construction Details <br />Former Chevron Service Station No. 94054 <br />2103 Country Club Boulevard, Stockton, California <br />Well No. Date <br />Top of <br />Casing <br />Elevation <br />(feet-MSL) <br />Total <br />Depth <br />(feet bgs) <br />Screen <br />Interval <br />(feet bgs) <br />Filter Pack <br />(feet bgs) <br />Bentonite <br />Seal <br />(feet bgs) <br />Notes <br />PZ-5 03/09/04 30 25- 30 Piezometer was destroyed April 20, 2004 <br />Soil Borings <br />SB-1 09/17/92 20 <br />SB-2 09/17/92 10 — <br />SB-2A 09/22/92 21 5 <br />Sf3-3 09/17/92 20 -- <br />SB-4 09/17/92 20 <br />SB-5 09/17/92 20 <br />SB-6 09/17/92 20 <br />SB-7 09/22/92 21 5 <br />SB-8 09/22/92 21 5 <br />GP-1 09/30/97 24 <br />GP-2 09/30/97 24 <br />GP-3 09/30/97 24 <br />GP-4 09/29/97 40 <br />GP-4B 09/30/97 31 <br />GP-5 09/29/97 32 <br />GP-6 09/29/97 30 <br />GP-7 09/29/97 32 <br />GP-8 09/29/97 15 <br />GP-9 09/29/97 24 <br />DP-1 09/27/01 <br />DP-2 09/27/01 — <br />DP-3 09/27/01 — <br />DP-4 09/27/01 <br />DP-5 09/27/01 <br />DP-6 09/27/01 - <br />DPS-1 (DP-1) 03/03/04 <br />DPS-2 (DP-2) 03/03/04 <br />DPS-3 (DP-3) 03/03/04 <br />DPS-4 (DP-4) 03/04/04 <br />DPS-5 (DP-5) 03/04/04 <br />DPS-6 (DP-6) 03/05/04 — <br />DPS-7 (DP-7) 03/05/04 <br />DPS-8 (DP-8) 03/05/04 — <br />DPS-9 (DP-9) 03/08/04 <br />DPS-10 (DP-10) 03/08/04 <br />DPS-11 (DP-11) 03/08/04 <br />DPS-12 (DP-12) 03/08/04 <br />DPS-13 (DP-13) 03/09/04 <br />DPS-14 (DP-14) 03/09/04 <br />CPT-01 02/19/04 45 <br />CPT-02 02/19/04 50 <br />CPT-03 02/19/04 48 <br />CPT-04 02/19/04 48 <br />CPT-05 02/19/04 50 <br />94054 Soil Boring and Well Construction Details.xlsx 3 of 4 <br /> Stantec
The URL can be used to link to this page
Your browser does not support the video tag.