Laserfiche WebLink
TABLE 3 <br />Soil Boring and Well Construction Details <br />Former Chevron Service Station No. 94054 <br />2103 Country Club Boulevard, Stockton, California <br />Well No. Date <br />Top of <br />Casing <br />Elevation <br />(feet-MSL) <br />Total <br />Depth <br />(feet bgs) <br />Screen <br />Interval <br />(feet bgs) <br />Filter Pack <br />(feet bgs) <br />Bentonite <br />Seal <br />(feet bgs) <br />Notes <br />PZ-5 03/09/04 30 25- 30 Piezometer was destroyed April 20, 2004 <br />Soil Borings <br />SB-1 09/17/92 20 <br />SB-2 09/17/92 10 — <br />SB-2A 09/22/92 21 5 <br />Sf3-3 09/17/92 20 -- <br />SB-4 09/17/92 20 <br />SB-5 09/17/92 20 <br />SB-6 09/17/92 20 <br />SB-7 09/22/92 21 5 <br />SB-8 09/22/92 21 5 <br />GP-1 09/30/97 24 <br />GP-2 09/30/97 24 <br />GP-3 09/30/97 24 <br />GP-4 09/29/97 40 <br />GP-4B 09/30/97 31 <br />GP-5 09/29/97 32 <br />GP-6 09/29/97 30 <br />GP-7 09/29/97 32 <br />GP-8 09/29/97 15 <br />GP-9 09/29/97 24 <br />DP-1 09/27/01 <br />DP-2 09/27/01 — <br />DP-3 09/27/01 — <br />DP-4 09/27/01 <br />DP-5 09/27/01 <br />DP-6 09/27/01 - <br />DPS-1 (DP-1) 03/03/04 <br />DPS-2 (DP-2) 03/03/04 <br />DPS-3 (DP-3) 03/03/04 <br />DPS-4 (DP-4) 03/04/04 <br />DPS-5 (DP-5) 03/04/04 <br />DPS-6 (DP-6) 03/05/04 — <br />DPS-7 (DP-7) 03/05/04 <br />DPS-8 (DP-8) 03/05/04 — <br />DPS-9 (DP-9) 03/08/04 <br />DPS-10 (DP-10) 03/08/04 <br />DPS-11 (DP-11) 03/08/04 <br />DPS-12 (DP-12) 03/08/04 <br />DPS-13 (DP-13) 03/09/04 <br />DPS-14 (DP-14) 03/09/04 <br />CPT-01 02/19/04 45 <br />CPT-02 02/19/04 50 <br />CPT-03 02/19/04 48 <br />CPT-04 02/19/04 48 <br />CPT-05 02/19/04 50 <br />94054 Soil Boring and Well Construction Details.xlsx 3 of 4 <br /> Stantec