My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BELLA VISTA
>
0
>
2900 - Site Mitigation Program
>
PR0543855
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 5:00:00 PM
Creation date
6/11/2021 4:05:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543855
PE
2960
FACILITY_ID
FA0024936
FACILITY_NAME
MOSS GARDENS HOUSING
STREET_NUMBER
0
STREET_NAME
BELLA VISTA
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16383063
CURRENT_STATUS
01
SITE_LOCATION
BELLA VISTA DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 28, 2018 <br />Project No. 2154-1817-01 <br />Ms. Vera Fischer, P.G., RWQCB <br />Work Plan for Additional Site Assessment <br />1817 South Fresno Avenue, Stockton, CA <br />Page 5 <br />Mark boring locations and contact Underground Service Alert to locate <br />underground utilities in the vicinity of the work site, and <br />Notify SJCEHD, the RWQCB, the City of Stockton, and Mr. Barnes of the <br />scheduled field activities. <br />Task 2: Field Activities <br />CPT Borings <br />Stratus will retain a C-57 licensed contractor to advance the CPT borings. CPT consists <br />of advancing a cone-tipped cylindrical probe (1.7 inches in diameter) into the ground <br />while simultaneously measuring the resulting resistance to penetration. A computer- <br />generated CPT log is plotted in the field, providing a continuous log of Site lithology. <br />Upon completion of CPT profiling, to a depth of approximately 90 feet bgs at location <br />CPT-2, the profiling borehole will be pressure grouted from the bottom of the borehole <br />up to surface grade. At the request of the USTCF, CPT profiling will only be completed <br />at one of the three proposed work locations (CPT-2) in order to reduce project costs. <br />Once the CPT profiling has been performed at CPT-2 (the centrally located boring), <br />hydropunch groundwater sampling will be performed from adjacent borings at locations <br />CPT-1 through CPT-3. The hydropunch sampler will be pushed to the bottom of the <br />sampling interval using 2-inch diameter steel rods. The steel rods will then be retracted <br />approximately four feet, exposing the screen, allowing for the collection of depth-discrete <br />groundwater samples. The groundwater samples will be collected using a clean bailer, <br />transferred to laboratory-supplied glass vials, properly labeled, and placed in an ice- <br />chilled cooler. The groundwater samples will be transported under strict chain-of- <br />custody protocol to a California-certified analytical laboratory for chemical analysis. <br />Upon completion of groundwater sampling, the sampling boreholes will be pressure <br />grouted from the bottom of the borehole up to surface grade. <br />The USTCF and the RWQCB have requested collection of groundwater samples at <br />approximately 60 and 90 feet bgs at each of the three sampling locations. Stratus will <br />utilize these requested depths of sampling as a guide for the sampling; however, Stratus <br />will ultimately review the CPT log obtained at CPT-2 and utilize geologic conditions to <br />select sampling locations. Permeable (sandy) strata will be preferentially targeted for <br />groundwater sampling, as contaminants could preferentially migrate within these <br />permeable strata. <br />KABames Trucking\Work Plans \bames trucking cpt work plan 2018.doc STRATUS
The URL can be used to link to this page
Your browser does not support the video tag.