My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0543966
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 1:29:08 PM
Creation date
6/14/2021 11:29:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543966
PE
2960
FACILITY_ID
FA0025009
FACILITY_NAME
WELL DESTRUCTION ACTIVITIES
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449003
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
steel USTs and associated product lines, installed in 1964, were replaced. All service station facilities, <br />including USTs, sumps, hoists, and piping were removed in 1994 during station demolition. The site is <br />currently paved and used for car sales. <br /> <br />1.2 Site Geology and Hydrogeology <br />Soil beneath the site consists primarily of silty clay and discontinuous lenses of silt or clayey silt containing <br />occasional, varying amounts of fine-grained sand. In general, soil encountered below approximately 6 to <br />10 feet below grade (fbg) is much stiffer than shallower soil. Soil borings advanced on the eastern <br />boundary of the site exhibit greater amounts of silt, while borings on the western boundary contain mostly <br />clay. <br />Groundwater flow direction at the site is consistently to the northwest at a gradient between approximately <br />0.005 and 0.01. <br /> <br />1.3 Previous Environmental Work <br />Environmental investigation of the site has been ongoing since 1994. To date, eight groundwater <br />monitoring wells, two excavations, four vapor probes, and fifteen cone penetration test (CPT) soil borings <br />have been completed (Figure 2). Soil gas sampling was performed at the site in 2009 and 2010. <br />Groundwater beneath the site was monitored and sampled quarterly from 1995 to 2011, and semi- <br />annually from 2011 to 2014 by wells MW-1 through MW-5, MW-6A, MW-6B, and MW-7, as well as the <br />sump located near the car wash on the property immediately north of the site (2480 Tracy Boulevard). <br />The sampling of all groundwater monitoring wells was discontinued in accordance with a SJCEHD <br />directive letter dated September 5, 2014 (Attachment A). <br /> <br />2. Proposed Scope of Work <br />GHD proposes advancing 3 soil borings (B-1 through B-3) in accordance with CRA's Work Plan and Work <br />Plan Addendum, and advancing two additional soil borings (B-4 and B-5) to collect shallow soil samples in <br />the vicinity of the former used-oil tank and soil samples outside of the hydrocarbon impacted area to <br />establish background metals concentrations. <br />Justification for each work location is discussed below: <br />B-1 through B-3 — investigate current hydrocarbon concentrations in soil in the vicinity of the former <br />gasoline USTs and dispenser islands for comparison to LTCP criteria. <br />B-4 — investigate constituents of concern in the vicinity of the former used-oil UST and confirm <br />historical hydrocarbon concentrations detected in sample VVX-8. <br />B-5 — assess background metals concentrations. <br />6322770-RPT 24-WORK PLAN ADDENDUM docx SECOND ADDENDUM 2
The URL can be used to link to this page
Your browser does not support the video tag.