Laserfiche WebLink
SJ COG, Inc. Sa11 Joaq1ti11 Cou11fy lVIulti-Spedes Habitat Co11servatio11 & Open Space Plan 555 East Weber Avenue• Stockton, CA 95202 • (209) 235-0600 • FAX (209) 235-0438 SJMSCP HOLD <br />TO: Local Jurisdiction: Community Development Department, Planning Department, Building <br />Department. Engineering Department, Survey Department, Transportation Department. Public <br />Works Department. <br />Other: <br />FROM: Laurel Boyd, SJCOG, Inc. <br />DO NOT AUTHORIZE SITE DISTURBANCE <br />DO NOT ISSUE A BUILDING PERMIT <br />DO NOT ISSUE FOR THIS PROJECT <br />The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi­ <br />Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br />Applicant has agreed to: <br />I)SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br />1.Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the <br />project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs. <br />If ITMMs are not signed within six months, the applicant must reapply for SJMSCP Coverage. Upon receipt <br />of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This is the effective date <br />of the ITMMs. <br />2.Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br />3.Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must: <br />a.Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br />being covered (the bond should be valid for no longer than a 6 month period); or <br />b.Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br />c.Dedicate lan<i in-lieu of fees, either as conservation easements or fee title; or <br />d.Purchase approved mitigation bank credits. <br />4.Within 6 months frcm the effective date of the ITMMs or issuance of a building permit, whichever occurs <br />first, the project applicant must: <br />a.Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or <br />b. Dedicate land in-lieu of fees, either as conservation easements or fee title; or <br />c.Purchase approved mitigation bank credits. <br />Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br />Project Title: PA-2100030 (MS) <br />Landowner: Camillo Leventini. et. Al & Joyce Saco. et.al Applicant: Baumbach & Piazza <br />Assessor Parcel #s: 070-050-47 <br />T ___ , R. ___ , Section(s): __ <br />Local Jurisdiction Contact: Ke'?.f-Y Gunter <br />The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br />Incidental Take Minimization Measures are properly implemented and monitored and that <br />appropriate fees are paid in compliance with the SJMSCP.