My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
6/28/2021 2:25:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SPEEDWAY) #68150
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification - Page 3 of 3 <br />Site Address: 13975 E. Hwy 88 <br />F. In -Tank Gauging I SIR Equiptne►►ta <br />Date of Testing/Servicing: 8128118 <br />® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />❑ Check this box if LLD's are not installed. <br />Com Tete <br />the followin checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />0 <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />O <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Yes <br />❑ <br />® <br />No* <br />N/A <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />❑ Check this box if LLD's are not installed. <br />Com Tete <br />the followin checklist: <br />® <br />Yes <br />0 <br />❑ <br />No* <br />N/A <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: ® 3 g.p.h. (1.); 0 0.1 g.p.h. (2); 0 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />n <br />Yes <br />❑ <br />No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />® <br />Yes <br />0 <br />No* <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />® <br />No* <br />N/A <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />(g <br />Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />® <br />Yes <br />❑ <br />0 <br />No* <br />N/A <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring <br />or disconnected? <br />system is disabled <br />M <br />Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring <br />malfunctions or fails a test? <br />system <br />L11Yes <br />❑ <br />❑ <br />No* <br />N/A <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />® <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section <br />H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.