My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014250
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DRAIS
>
2658
>
2600 - Land Use Program
>
PA-2100122
>
SU0014250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 11:37:31 AM
Creation date
6/29/2021 11:44:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014250
PE
2622
FACILITY_NAME
PA-2100122
STREET_NUMBER
2658
Direction
S
STREET_NAME
DRAIS
STREET_TYPE
AVE
City
STOCKTON
Zip
95215-
APN
18323014
ENTERED_DATE
6/22/2021 12:00:00 AM
SITE_LOCATION
2658 S DRAIS AVE
RECEIVED_DATE
6/25/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 � S .1 (' () (i , 1110 . <br /> A, Post a bond For payment oFthe appIicsbie SJMSCP fee covering the entire L}(ofthe project acreage being covered(the bond <br /> should be valid For no longer than n 6 inonth peri M),or <br /> b. Pay the appropriate SJM SCP fee For the entirety of the project acreage being covered;or <br /> c. Dedicate land it0icu of fees,cither as cons urvation eascmtsnIs or fee title;or <br /> d. Purchase approved mitigation hank credits. <br /> 4. Within 6 tnonIli s from the effective date oFthe 1TMMss or issuance of a building permit,Whichever occurs first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> 1). Dedicute land in-lieti of fees,either as conservation easements or 1i.�e title:or <br /> e. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of(tie mitigation fee shall subject the bond to be called. <br /> ■ Receive your Certificate of Payment and release the required permit <br /> 1t should be noted that if this project has any potential impacts to waters of the United States(pursuant to Section 404 Clean Water Act], <br /> it would require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 94 <br /> days. It may be prudent to obtain a preliminary wetlands reap from a qualified consultant.If waters of the United States are confirmed on <br /> the project site, the Corps and the Regional Water Quality Control Board(RWQCB)would have regulatory authority over those mapped <br /> areas(pursuant to Section 404 and 409 of the Clean Water Act respectively]and permits would be required from each of these resource <br /> agencies prior to grading the project site. <br /> If you have any questions, please call(209)235-0600. <br />
The URL can be used to link to this page
Your browser does not support the video tag.