Laserfiche WebLink
3 1 S .iU0 6 , 1itc . <br /> _ S j C O G, Inc. <br /> ,Yan• oagitin Cniuql+Alalli-SIviies I Prthilal Coasenwion&-Opeli.1pace i'lin <br /> > 555 Last Weber Avenue•Stockton,CA 95262■ (209)235-0600 9 FAX(209)235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department, Planning Department, Building <br /> De artment Engineering Department, Survey Department, Transportation Department, Public <br /> Works Department, <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br /> Applicant has agreed to: <br /> I SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental.fake Minimization Measures(1TMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> it r MMs are not signed willtin six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCCIG.Inc.staff will sign the ITM Ms, This is the cflectivc date <br /> orthe ITMMs. <br /> 2. Under no circumstance shall around disturbance occur without compliance and satisfaction of'the ITMMs, <br /> 3. Upon issuance❑I'fully executed iTMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond For payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a C month period):or <br /> K Pay the appropriate S.IMSCP fee for(lye entirety ofthe project acreage being covered:or <br /> c. Dedicate land in-lieu of lees,either as conservation easements or fee title:or <br /> d. Purchase approved mitigation hank credits. <br /> 4. Within 6 months from the cnectivc date of the ITMMs or issuance of a building permit,whicheveroccurs <br /> first,the project applicant must: <br /> a. ['ay the appropriate S,IMSCP for the entirely of the project acreage being covered:or <br /> b. Dedicate land in-lieu of fees.either as conservation easements or fee title;or <br /> c. Purchsise approved mitigation bank credits. <br /> Failure to satisfy the obi igations of(he mitigation fee shall subject the bond to be called. <br /> Project Title: PA-2'100122 (MS) <br /> Landowner: Douglas Carmean,Ann Carmean Adams Applicant: Dillon& Murphy <br /> Assessor Parcel#s: 183-230-14 <br /> J <br /> T , R , Section(s): <br /> Local Jurisdiction Contact: Giuseppe Sanfilippo <br /> The LOCAL JURISDICTIDN retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />