Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page a of s) <br /> Vill . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Ymm <br /> N NA <br /> Are the visual and audible alarms operational? © Q ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, © ❑ <br /> functional) tested , and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with ® EJtheir proper operation? <br /> El <br /> Was monitoring system set-up reviewed to ensure proper settings? 10 ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested , and confirmed operational? ❑ El <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ Z <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br /> disconnected? ❑ ❑ Z <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? El ❑ o <br /> Which sensors initiate positive shut down? (Check all that apply.) [l Sump ElUnder-DispenserContainment <br /> If alarms are relayed to a remote monitoring station, Wall communications equipment (e. g . , modem) operational? I ❑ El Q <br /> For any answer of "N" above, describe In Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed If In-tank clau in is used to perform leak detection monitoring, <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for <br /> round faults? ❑ ❑ ❑ <br /> Were all in-tank gauging probes visually Inspected for damage and residue buildup to ensure that floats move freely, functionally El EJ Eltested , and confirmed operational? <br /> Was accuracy of system's product level readings tested ? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? F ❑ El <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ <br /> For any answer of "N" above, describe in Section X1 how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> 8 ; > <br /> RM l <br /> YJN <br /> ENVIRONMENTAL HEALTH <br /> l`FP/ TSI NT <br /> Y = Yes, N = No, NA = Not Applicable <br /> i <br />