Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XII . LINE LEAK DETECTOR TESTING <br /> © Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section.) :Y]: NNA <br /> This section must be completed If LLDs are Installed. <br /> Was a leak simulated to verify LLD performance? ❑ ❑ ❑ <br /> (Check all that apply.) Simulated leak rate verified: [] 3 GPH ❑ 0 . 1 GPH ❑ 0.2 GPH <br /> Was the testing apparatus properly calibrated ? ❑ ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? ❑ ❑ ❑ <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected ? ❑ ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? ❑ ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected ? ❑ I ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ ❑ <br /> For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks ? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements ? ❑ I ❑ ❑ <br /> For any answer of "N" above, describe in Section X111 how and when these issues were or will be corrected. <br /> XIII . COMMENTS <br /> XIV, VACUUM I PRESSURE I HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br /> PW <br /> Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> El Pass El Fail <br /> ❑ Pass E] Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />! ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> I How was interstitial communication verified? Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> ❑ Other (Describe the method in section XV below.) ❑ Gauge <br />[ Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in section XV below.) <br /> 4 For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallon Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = VaaunvPressure/Hydrostatic, ID = Identification <br /> i <br />