My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
6
>
1900 - Hazardous Materials Program
>
PR0536311
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 8:45:32 AM
Creation date
7/8/2021 8:35:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0536311
PE
1920
FACILITY_ID
FA0020870
FACILITY_NAME
EL DORADO ST PARTNERS,LP C/O CBRE
STREET_NUMBER
6
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14903006
CURRENT_STATUS
01
SITE_LOCATION
6 S EL DORADO ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CBRE I Business Continuity Management <br />Damage Assessment & Office Closure <br />Health & Safety In the event that a hazardous material is released, ensure <br />coordination with the Health Safety and Environmental (HSE) team. <br />See: <br />h_itpid/nowigvtar,cbrg.ccm/ENlDeacrlmenllHSSEIHSE +Cantads. <br />htm, or contact the Emergency'Hotline: ] -$66-635-2512 <br />Damage assessment ✓ Using damage assessment checklist, determine the impact to CBRE <br />operations: <br />• Facility and building operations <br />• CBRE work space <br />• CBRE technology rooms and equipment <br />Business Operations Determine critical operations that must be restarted immediately. <br />Office Closure If applicable, close the office location. A notification message may be sent <br />to staff. <br />Insurance reporting Notify owner's insurance and CBRE Global Risk Management of possible <br />Claims, <br />Business Operations - Short-term Recovery (0 to 1 day} <br />Notification ✓ Ensure regular client and tenant communications procedures are <br />established. <br />Office Closure Updates ✓ Ensure that staff is aware of office closures (and re -openings) and <br />alternate workplace location. The following CBRE corporate <br />communication tools are available: <br />• Mass Notification. A text, phone and email message may be sent <br />to all staff using Notifind. For assistance, contact the Business <br />Continuiiyteam via the Emergency Hotline: 1.866-635-2512 <br />Email access Ensure staff may access email. Use email guide to use Outlook Web <br />Access if needed. <br />Phone Forwarding Where feasible, forward management office phones to mobiles or alternate <br />location. Forwarding for short-term outages is usually available only when <br />power remains to the building. <br />VPN access for share Users working from home or other (non-CBRE locations) should use VPN <br />drive and CBRE and CBRE devices to access their systems. Use the VPN guide for <br />applications access assistance in logging on. <br />Critical operations Where short-term deliverables, or critical functions must be performed, a <br />limited number of staff may be relocated to nearby facilities as appropriate: <br />• Determine key employees that must be relocated. <br />• Verify that there is sufficient space available at alternate locations. <br />For Internal Use Only CBRE <br />
The URL can be used to link to this page
Your browser does not support the video tag.