Laserfiche WebLink
Discrete Depth Soil&Soil Vapor Assessment Work Plan Page 4 <br /> CPSA,Lodi,California <br /> March 12,2025 <br /> 18 SOUTH PLEASANT AVENUE RESIDENCE <br /> CHT, on behalf of the City, proposes to perform the following activities to further delineate the <br /> vertical extent of the residual PCE plume in soil and soil vapor in the vicinity of the 18 S.Pleasant <br /> Ave. residence— <br /> • Perform discrete depth soil and soil vapor sampling at two locations outside the 18 S. <br /> Pleasant Ave. residence where the highest SS PCE concentrations were observed during <br /> PSG sampling — SP-1 located northwest of the residence near PSG-1 and SP-2 located <br /> northeast of the residence near PSG-2, and, <br /> • Collect one (1) indoor air sample in the residence and one (1) ambient air sample from <br /> outside the building wall near the alleyway. <br /> DISCRETE DEPTH SOIL & SOIL VAPOR SAMPLING <br /> CHT will perform discrete depth soil and soil vapor sampling at locations SP-1 and SP-2 (see <br /> Figure 3) to delineate the vertical extent of the PCE and TCE in soil vapor along the sewer lateral <br /> emanating from the building. <br /> Methodology <br /> CHT proposes to install soil borings at SP-1 and SP-2 to a depth of 40 to 45 feet below ground <br /> surface (ft-bgs) using a dual-purpose limited access rig that can perform continuous soil coring. <br /> The soil cores, which will be collected in acetate liners, will be used to log the soil, determine the <br /> targeted depth for collection of soil samples, and the screen intervals for the temporary soil <br /> vapor (TSV) probe depths. TSV probes will then be installed near SP-1 and SP-2 and in <br /> accordance with the 2012 DTSC's Advisory-Active Soil Gas Investigations (Advisory). At each <br /> boring location, the drill rig will advance the rods to a total depth of 40 to 45 ft-bgs where the 40 <br /> or 45-foot TSV probe will be installed and then drill separate borings for installing the TSV probes <br /> at depths of 5, 10, 15, and 25 ft-bgs. The exact depth of the soil samples and TSV probes will be <br /> determined from the soil cores. <br /> Each TSV probe will be constructed with a 1-foot long filter pack in the bottom of the borehole <br /> consisting of#2/12 Cemex sack sand. A 0.250-inch outside diameter(0.187-inch inside diameter) <br /> polyethylene tube with a HDPE filter at the bottom of the tube will be placed in the center of the <br /> borehole during placement of the sand so that the HDPE filter is located in the center of the sand <br /> interval. To ensure that representative soil vapor samples are collected for each specified depth, <br /> the annular space above the sand will be temporarily sealed using hydrated bentonite slurry that <br /> will be pumped down the hole using tremie pipes to a height of 0.5 feet above the top of the sand. <br /> 581 MONTEGO TERRACE,SUNNYVALE,CA 94089 TEL:415-424-3009 <br />