My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1992-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2023 1:56:27 PM
Creation date
7/16/2021 12:17:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1992-1999
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to of balifornia 49 ornia Integrated Waste Management Board <br /> ANNUAL INFLATION:.FACTORr ; _ <br /> 1995 - <br /> Facility <br /> 995 Facility Name: Facility No.: <br /> Title 14, California Code of Regulations, Division 7, Chapter 5, Article 3.4, section 18272(d), requires you to submit <br /> a report to the California Integrated Waste Management Board (CIWMB) by March 1 each year. The report <br /> calculates the inflationary increase in the closure and postclosure maintenance cost estimates for the previous <br /> calendar year. <br /> Based on information obtained from the U.S. Department of Commerce, Bureau of Economic Analysis, on <br /> April 2, 1996, the inflation factor for 1995 is 1.024. <br /> Multiply EACH COST ESTIMATE by the inflation factor to determine the new ADJUSTED COST ESTIMATES as <br /> illustrated below. <br /> SAMPLE: The ABC Landfill's COST ESTIMATE for CLOSURE in 1995 was $2,000,000. Using the 1995 infla- <br /> tion factor of 1.024, they recalculated their ADJUSTED CLOSURE COST for 1996 to $2,048,000. <br /> Their COST ESTIMATE for POSTCLOSURE MAINTENANCE in 1995 was $1,500,000. Using the <br /> 1995 inflation factor of 1.024, their ADJUSTED POSTCLOSURE MAINTENANCE COST for 1996 is . <br /> $1,536,000. <br /> $2,000,000 x 1.024 = $ 2,048,000 <br /> $1,500,000 x 1.024 = $1,536,000 <br /> Using the inflation factor for 1995, calculate the following: <br /> $ x 1.024 = g <br /> Closure Costs estimate in 1996 dollars <br /> $Annual Po. x 1.024 = $ <br /> stclosure Costs X 15 years estimate in 1996 dollars <br /> Operator/Owner Signature Company Name <br /> Title of Person Signing Area Code\Phone Number <br /> Date <br /> CIWMB 114A (3194) <br />
The URL can be used to link to this page
Your browser does not support the video tag.