Laserfiche WebLink
the North County Landfill are different. Moreover, it would be difficult for the LEA to <br /> adequately inspect each of the three operations using the form CIWMB 52, which is only <br /> applicable to the design and operations of the land filling activities. Therefore, we <br /> recommend that the LEA work with the Board's Permitting and LEA Support Division <br /> (PLEAS) staff to complete the necessary permitting change(s) that would allow the LEA <br /> to generate the types of the inspections for each different operation using the appropriate <br /> inspection form for the operation. <br /> 2. New Landfill Gas Regulations: We encourage the LEA to work with the owner and <br /> operator of the landfill and the appropriate Board staff to complete the submittals, <br /> reviews, approvals, and installations of the required LFG monitoring and Control <br /> Systems by the established due dates. <br />