Laserfiche WebLink
3 Areas anticipated to receive concentrated flow on Module 4 and near the storm water <br />retention pond south of Module 4 will receive concrete rubble as energy dissipaters. <br />4 Areas of the Module 3 surface with minimal vegetation, primarily the tops of slopes <br />on the southern face, will be reseeded to establish additional vegetation. <br />5 The ramp leading to the top deck of Module 1 and 3 will be crowned to shed surface <br />run-off both sides of the ramp. The shallow drainage ditches will be cleared out on <br />both sides of the ramp to allow for collection of surface run-off. These ditches will be <br />protected against erosion by the placement of erosion control mats or rock in the <br />ditch invert. <br />Module 1 and 3 leachate return will continue unchanged. Leachate will be returned to the <br />refuse in accordance with the Waste Discharge Requirements issued by the Regional <br />Water Quality Control Board. Leachate from Modules 1 and 3 will be delivered to the <br />infusion points in Module 3. Leachate from Module 4 is delivered to an infusion point in <br />Module 4, approximately 100 feet east of the Module 4 leachate tank. Sufficient infusion <br />points are available to provide infusion of winter leachate production. <br />INSPECTIONSFURTHER r ADDITIONAL WORK <br />Title 27 requires that the site be inspected for drainage by October 1St, and that any <br />drainage problems be corrected within a month. All drainage ditches will be re inspected <br />and cleaned out as necessary to provide unobstructed flow of storm water. All culverts <br />will be re inspected and cleaned out as necessary as well. Any additional work identified <br />in that inspection will also be completed before the winter rains. <br />Drainage ditches were significantly improved in 2007 in preparation for the winter of <br />2007/08. These improvements remain for the winter of 2007/08. <br />N:\1 North County\08-09 Winterization\NC-Winterization Plan08.doc <br />North County Sanitary Landfill 2 San Joaquin County Public Works <br />Winterization Plan 2008/09 Solid Waste Division <br />