My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:14:49 PM
Creation date
7/16/2021 1:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017-2018
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.1 PURPOSE <br />This work plan presents the procedures for the installation of groundwater <br />(GW -3E) monitoring well at North County Recycling Center and Sanitary <br />Landfill (NCRCSL). <br />1.2 SITE DESCRIPTION <br />NCRCSL is located at 17720 East Harney Lane, approximately nine miles <br />east of Lodi. It is a single solid waste management unit, designated Class <br />III, accepting non -hazardous municipal solid waste and inert waste. The <br />site is 185 acres in area, comprised of lined modules, each constructed on <br />an as -needed basis. The landfill is expected to close in 2070, based on <br />current disposal rates and current permitted capacity. <br />1.3 REASON FOR INSTALLING MONITORING WELL <br />The current down gradient well G -3D is dry. The new well is a <br />replacement well. <br />The location of the GW well is away from the refuse footprint (Figure 1). <br />Well installation work will not include drilling into refuse or contact with <br />refuse. Well location will be adjusted in the field based on site conditions. <br />The well will be surveyed after installation. <br />1.5 CONSTRUCTION SCHEDULE <br />SWD will schedule installation of the GW monitoring well after approval of <br />drilling permit from San Joaquin County Environmental Health Department <br />(EHD). Drilling and installation of each GW well will take minimum of three <br />(3) working days. The work hours will be Monday to Friday from 7:00 am to <br />4.30 pm. <br />1.6 UTILITIES CLEARANCE <br />Prior to drilling, Underground Service Alert (USA) will be notified. Drilling <br />location near overhead power lines will be checked for drill rig clearances <br />before drilling. Well location will be adjusted as needed. <br />Work Plan- NC -Groundwater Monitoring Well Installation San Joaquin County <br />Department Of Public Works <br />1 Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.