Laserfiche WebLink
10. Readings of pH, specific conductance, turbidity, DO, oxidation / reduction <br />potential (ORP), and temperature taken before, during, and after development. <br />11.0ther information as requested by the Engineer. <br />PART 4 ACCEPTANCE <br />A. County will accept wells installed in accordance to the specifications. County will <br />not accept a well installed without EHD inspection. Contractor will be responsible <br />for damages caused to the well casing due to gross negligence during drilling <br />and well installation. Contractor shall not drop any tools or bailers in the well <br />casing.. <br />B. If the County disapproves a well, then the Contractor shall: <br />1. Repair defective components of the well. If defective components are not <br />repairable, then the Contractor shall abandon that well and install a new well, or <br />re -drill the well found to be unacceptable, at no additional cost to the County. <br />PART 5 MEASUREMENT AND PAYMENT <br />5.01 GENERAL <br />A. Payment shall be full compensation for labor, materials, tools, equipment <br />overhead for each task or line item listed in the bid sheet. <br />B. Partial payment will not be made for each project. <br />C. Payment will be made after the acceptance of the wells by the County. <br />A. Mobilization/ demobilization shall include all work according to mobilization <br />anddemobilization specifications in the Scope of Work, and according to the <br />specifications specified herein. Demobilization shall include submittal of required <br />reports. <br />B. Payment for mobilization/demobilization will be based on the lump sum price <br />quoted in the proposal. <br />5.03 GROUND WATER WELL <br />A. Measurement of depth will be by weighted tape or other method acceptable to <br />the Engineer. <br />NC -Groundwater Monitoring <br />Well Specifications 12/08/17 Page 10 of 13 San Joaquin County Public Works Dept <br />Solid Waste Division <br />