Laserfiche WebLink
5.08 PUMP INSTALLATION <br />Payment for each well pump installation shall be per lump sum cost quoted in the <br />bid proposal. <br />A. Measurement for payment for installing bollards shall be per the number of <br />bollards installed per the contract figures. <br />B. Payment for installing bollards shall be per the unit cost quoted in the bid <br />proposal. The unit price quoted shall include full compensation for installing <br />bollards completely as shown on the contract figures and specified herein <br />END OF SECTION <br />NC -Groundwater Monitoring <br />Well Specifications 12/08/17 Page 12 of 13 San Joaquin County Public Works Dept <br />Solid Waste Division <br />