My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:14:49 PM
Creation date
7/16/2021 1:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017-2018
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />3. Soil Drainage <br />Soil berms will be installed along the downslope edges of Module 5 to convey <br />surface storm water runoff to the down drains (Figure 1). This task is expected to <br />be completed by the end of October, weather permitting. <br />4. Grading <br />The top deck will be graded with 3% slope to aid storm water runoff. This is an <br />on-going task as refuse is placed. <br />4. Drainage Ditches <br />A new drainage ditch on the west side of Module 5 has been created to converge <br />storm water to the new storm water pond located on the southwest corner of the <br />landfill. The drainage ditch will be hydroseeded and will have check dams. <br />•I <br />1. Storm Water <br />a. Non -Contact Storm Water <br />A soil berm will be constructed in the middle of Module 5B to direct storm water <br />to a low point (Figure 1). The berm will terminate outside of the anchor trench to <br />allow excess storm water overflow out of the lined Module. <br />A small sump pump will be placed at the low point next to the soil berm to pump <br />ponding storm water into the storm water pond (Figure 1). The sump pump will <br />be placed over a small Visqueen to protect the operations layer. <br />The areas outside of Module 5B have been designed to drain into the new storm <br />water pond. A temporary diesel powered pump will be used to pump out storm <br />water from the lower storm water pond in order to maintain storage capacity <br />(Figure 1). <br />2. Erosion/Sedimentation Control <br />The side slopes of Module 513's operations layer, new drainage ditch slopes and <br />other disturbed areas around Module 5B will be hydroseeded. <br />N:\1 North County\Winterization\2017\2017-9-13-NC-17-18 Winterization Plan.doex <br />NC -2017-18 Winterization Plan Page 3 of 3 Revised 10/2/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.