My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:14:49 PM
Creation date
7/16/2021 1:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017-2018
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Erosion /Sedimentation Control <br />The existing side slopes of Modules 1-4 have established vegetation to provide <br />erosion and sediment control. <br />2017 WINTERIZATION TASKS <br />Following tasks will be done as part of 2017 winterization: <br />MODULES 1-4 <br />1. Drainage Ditches <br />Existing drainage ditches will be inspected and cleaned from vegetation and <br />debris. A new drainage ditch on the west side of Modules 1-4 has been created <br />to converge storm water to the wetlands. The drainage ditch will be hydroseeded <br />and will have check dams. <br />2. Down Drains <br />Existing down drains will be inspected and re -connected if necessary. <br />3. Erosion/Sedimentation Control <br />Mulch processed will be placed on the south east corner of Module 3 and 4 to <br />minimize erosion. The mulch is free from green waste. This task is expected to <br />be completed by the end of October, weather permitting. <br />MODULE 5 <br />1. Winter Pad <br />A new winter pad is being built in Module 5 for refuse disposal during rainy days. <br />The winter pad will be built with six -inches of recycled aggregate base and <br />concrete rubble over compacted refuse. Module 5's winter pad is expected to be <br />completed by the end of October. <br />2. Daily Cover Soil <br />Daily cover soil has been stockpiled near the winter pad for winter operations. <br />NC -2017-18 Winterization Plan Page 2 of 3 Revised 10/2/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.