My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 2:14:49 PM
Creation date
7/16/2021 1:25:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017-2018
RECORD_ID
PR0440058
PE
4433
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
01
SITE_LOCATION
17720 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Taj M. Bahadori -2- 19 November 2014 <br /> San Joaquin County DPW <br /> Stockton <br /> .includes maximum slopes of 3HAV with side slope benching for slope stability. Factors of <br /> safety associated with interim slopes will be at least 1.5. Samples of materials used in liner <br /> construction will be shear-tested in the laboratory per project specifications to verify. <br /> assumptions used in slope stability analysis. Leachate from the module will be collected in an <br /> LCRS sump to be constructed in the southwest comer of the module and shared with future <br /> Module 6. Storm water runoff from the project area will be directed to a temporary storm water <br /> basin to be constructed immediately south of the module and then pumped, as necessary, into <br /> the landfill's storm drainage system. <br /> Our review of the design report indicates that the proposed design for Module 5, Phase 1 <br /> complies with WDR Order R5-2010-0016. Based on this review and the certifications of the <br /> various reports, plans, and drawings therein, we therefore approve of the report. Please inform <br /> us when the above containment system components will be constructed so that we can <br /> schedule necessary inspections by Water Board staff. <br /> If you have anestd ns, please contact me by telephone at(916) 464-4641 or by email at <br /> iohn.mood waterbo rds.ca. ov. <br /> g <br /> Moodyr Resource Control Engineer <br /> 27 Permitting and Mines <br /> Enclosures <br /> cc: Christine Karl, Permitting &LEA Support, CaiRecycle, Sacramento <br /> Robert McClellon, San Joaquin County Environmental Health Department, <br /> Stockton <br /> Eric Schneider, CB&I Environmental and Infrastructure, Inc., Sacramento <br />
The URL can be used to link to this page
Your browser does not support the video tag.