Laserfiche WebLink
Tracy Materials Recovery RFI ame dment#3 Page 1 of 2 <br /> Garrett T. Backus [EH] <br /> From: Garrett T. Backus [EH] <br /> Sent: Thursday, May 11, 2006 4:36 PM <br /> To: 'Evan Edgar' <br /> Subject: RE: Tracy Materials Recovery RFI amendment#3 <br /> Hi Evan, <br /> I am finishing up my review of Tracy Material Recovery &Transfer Facility RFI amendment# 3. 1 need <br /> clarification regarding the increase of the yard composting area in the site plan. I calculate that the compost area <br /> footprint is 156,800 square feet in the amended site plan. I looked at the Evaporation Pond information in the <br /> '93 RFI, Appendix E to determine if the pond was adequate to handle the increased compost footprint. It appears <br /> that the Evaporation Pond was designed to handle a maximum 90,000 square feet footprint (appendix E, p E-3, <br /> paragraph 4 and Table E-3). Can the evaporation pond handle the increased footprint? If so, please explain how <br /> in amendment# 3. <br /> Thx, <br /> Garrett Backus <br /> San Joaquin County Environmental Health Dept <br /> (209) 468-2986 <br /> ---Original Message----- <br /> From: Evan Edgar [mailto:evan@edgarinc.org] <br /> Sent: Tuesday, May 02, 2006 10:05 PM <br /> To: Garrett T. Backus [EH] <br /> Cc: 'KERRY SULLIVAN'; 'Mike Repetto'; 'Scott Stortroen' <br /> Subject: RE: Tracy Materials Recovery RFI amendment #3 <br /> Garrett: <br /> I have revised the Operations Plan to include the equipment for the inert storage plan. Attached is the <br /> revised RFI Amendment No. 2 -version 4. <br /> 1 am also discussing the NOE with the County Planning Department. Yes, we do plan that the NOE would <br /> apply to all of RFI Amendment No. 3 attached. <br /> We are also working with the Planning Department on the EIR Technical Addendum to allow C&D and inert <br /> crushing. <br /> Best regards. <br /> Evan <br /> E <br /> Evan W.R.Edgar <br /> Edgar&Associates,Inc <br /> 5/12/2006 <br />