Laserfiche WebLink
06/21/2006 06:32 9167391216 PAGE 02 <br /> State of California California Integrated Waste <br /> CIWMB 216(Rev. 02/04) Management Board <br /> I Amendment Determination Checklist <br /> :Attached are the following items: Date of LEA received package: <br /> ❑ JTD Index <br /> ® Application form <br /> ❑A copy of the RFI Amendment Date LEA denied RFI Amendtx mt: <br /> ❑ New CEQA documentation since the last <br /> permit was issued(including any exemptions) <br /> Date LEA accept RFI Amendment: <br /> Other: <br /> 'Etre LEA detesmiKaiion should a Aswer the followin uestious: <br /> 1)What are the changes covered by the RFI Amendment? <br /> See RFI Amendment No. 3 Attached. Inert said C&D Processing and Storage,Storage of universal wastes,modifications <br /> to yard waste processing area,modifications to wood waste processing area.,Building addition for baler and storage of <br /> clean materials. <br /> 2)Is the proposed change(s)consistent with CEQA? ®YES ❑NO <br /> What CEQA documents were used to determine this? <br /> San Joaquin County Community Development Department is processing a Notice of Exemption based on the October <br /> 1993 Environmental Impact Report. <br /> Has the LEA determined that the change would not create any adverse environmental impacts and is exempt from CEQA? <br /> YES ❑NO <br /> What exemption classification did the LEA or other lead agency use?Class I(a) ,Section 5301 <br /> 3)Does the proposed change impact the facility's ability to comply with financial assurances and operating liability? <br /> ❑YES ®NO <br /> 4)Is the proposed change consistent with state minimum standards? Z YES ❑NO <br /> Will the change exacerbate any current compliance problem at the facility? 0 YES ®NO <br /> Would implementation of the change effect the operator in complying with any enforcement order? <br /> [)YES ®NO <br /> 5)Does this change conflict with any part of the governing permit? []YES ®NO <br /> 7)Will the proposed change in the RFI Amendment require the operator to amend the closure post closure plan? <br /> ❑YES ®NO <br /> 8)Any additional information required by the operator: <br /> Drains a claculation for increased i evious surfaces <br /> Additional Information: <br /> Completion of this form is not required by regulation, however,it will provide the CIWMB with the Information required by <br /> 27 CCR 21665. <br />