Laserfiche WebLink
<br /> <br /> <br />ATTACHMENT D <br />REQUIREMENTS FOR MONITORING WELL INSTALLATION WORKPLANS AND <br />MONITORING WELL INSTALLATION REPORTS <br /> <br />Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan <br />containing, at a minimum, the information listed in Section 1, below. Wells may be installed <br />after staff approves the workplan. Upon installation of the monitoring wells, the Discharger <br />shall submit a well installation report which includes the information contained in Section 2, <br />below. All workplans and reports must be prepared under the direction of, and signed by, a <br />registered geologist or civil engineer licensed by the State of California. <br /> <br />SECTION 1 - Monitoring Well Installation Workplan and <br />Groundwater Sampling and Analysis Plan <br /> <br />The monitoring well installation workplan shall contain the following minimum information: <br /> <br />A. General Information: <br /> Purpose of the well installation project <br /> Brief description of local geologic and hydrogeologic conditions <br /> Proposed monitoring well locations and rationale for well locations <br /> Topographic map showing facility location, roads, and surface water bodies <br /> Large scaled site map showing all existing on-site wells, proposed wells, surface <br />drainage courses, surface water bodies, buildings, waste handling facilities, utilities, <br />and major physical and man-made features <br /> <br />B. Drilling Details: <br /> On-site supervision of drilling and well installation activities <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals (if appropriate) and logging methods <br /> <br />C. Monitoring Well Design (in narrative and/or graphic form): <br /> Diagram of proposed well construction details <br />- Borehole diameter <br />- Casing and screen material, diameter, and centralizer spacing (if needed) <br />- Type of well caps (bottom cap either screw on or secured with stainless steel <br />screws) <br />- Anticipated depth of well, length of well casing, and length and position of <br />perforated interval <br />- Thickness, position and composition of surface seal, sanitary seal, and sand pack <br />- Anticipated screen slot size and filter pack <br />