My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_WDR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
5950
>
4200 – Liquid Waste Program
>
PR0530041
>
_WDR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 8:37:59 AM
Creation date
7/22/2021 8:37:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
WDR
RECORD_ID
PR0530041
PE
4242
FACILITY_ID
FA0004443
FACILITY_NAME
CBUSO dba Woodbridge Winery
STREET_NUMBER
5950
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
Rd
City
Acampo
Zip
95220
APN
01709058
CURRENT_STATUS
01
SITE_LOCATION
5950 E Woodbridge Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EHIntern
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT D -2- <br />R5-2012-0103 <br />CONSTELLATION WINES U.S., INC. dba WOODBRIDGE WINERY <br />WOODBRIDGE WINERY <br />SAN JOAQUIN COUNTY <br /> <br />D. Well Development (not to be performed until at least 48 hours after sanitary seal <br />placement): <br />Method of development to be used (i.e., surge, bail, pump, etc.) <br />Parameters to be monitored during development and record keeping technique <br />Method of determining when development is complete <br />Disposal of development water <br /> <br />E. Well Survey (precision of vertical survey data shall be at least 0.01 foot): <br /> Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> Datum for survey measurements <br /> List well features to be surveyed (i.e. top of casing, horizontal and vertical <br />coordinates, etc.) <br /> <br />F. Schedule for Completion of Work <br /> <br />G. Appendix: Groundwater Sampling and Analysis Plan (SAP) <br />The Groundwater SAP shall be included as an appendix to the workplan, and shall be <br />utilized as a guidance document that is referred to by individuals responsible for <br />conducting groundwater monitoring and sampling activities. <br /> <br />Provide a detailed written description of standard operating procedures for the <br />following: <br />- Equipment to be used during sampling <br />- Equipment decontamination procedures <br />- Water level measurement procedures <br />- Well purging (include a discussion of procedures to follow if three casing volumes <br />cannot be purged) <br />- Monitoring and record keeping during water level measurement and well purging <br />(include copies of record keeping logs to be used) <br />- Purge water disposal <br />- Analytical methods and required reporting limits <br />- Sample containers and preservatives <br />- Sampling <br />o General sampling techniques <br />o Record keeping during sampling (include copies of record keeping logs to be <br />used) <br />o QA/QC samples <br />- Chain of Custody <br />- Sample handling and transport <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.