My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014303
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
17337
>
2600 - Land Use Program
>
PA-2100146
>
SU0014303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 9:14:53 AM
Creation date
7/22/2021 12:14:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014303
PE
2622
FACILITY_NAME
PA-2100146
STREET_NUMBER
17337
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
LINDEN
Zip
95236-
APN
06510044, -45
ENTERED_DATE
7/20/2021 12:00:00 AM
SITE_LOCATION
17337 E EIGHT MILE RD
RECEIVED_DATE
7/21/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21S .1 (_' O ( i , Ing: . <br /> This Project is subject to the SJMSCP. Per requirements of the SJMSCP, this project must seek coverage due to <br /> required Army Corr) permitting and Section 7 consultation. This project is subject to a case-by-case review. This <br /> can be a 90 day process and it is recommended that the project applicant contact SJMSCP staff as early as <br /> possible. It is also recommended that the project applicant obtain an information package. http://www.sicog.org <br /> If this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground <br /> disturbance <br /> ■ SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to <br /> any ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs are not signed within six months, <br /> the applicant must reapply for SJMSCP Coverage. Upon receipt of'signed ITMMs from project applicant,SJCOG,Inc.staff will <br /> sign the ITMMs. This is the effective date of the ITIVIMs. <br /> 2. Under no circumstance shal I ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of filly executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the <br /> bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs first,the project <br /> applicant must <br /> a. Pay the appropriate SJMSCP for the entirely of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> C. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> ■ Receive your Certificate of Payment and release the required permit <br /> If you have any questions, please call (209) 235-0600. <br />
The URL can be used to link to this page
Your browser does not support the video tag.